Structure and scope

Home additions

Adding floor area starts in the ground and ends at the roof line. We plan the load path first, then the foundation, then the tie-in, then everything you will actually see.

16 to 30 weeks on site$285 to $520 per sq ft

Every addition answers the same question before it answers any other: where does the new weight go? Snow load on a new roof travels through rafters or trusses, into a ridge beam or bearing wall, into headers, into posts, into a footing, into soil that has to be below frost depth. In Bozeman that means a footing bottom at 36 inches minimum, and 42 inches in the colder benches. If any link in that chain is missing, the addition settles away from the original house and the drywall joint at the tie-in cracks every spring.

The second question is the tie-in. A new roof plane meeting an old one needs a proper valley, step flashing and an ice barrier that runs at least 24 inches inside the warm wall line. A new floor meeting an old one needs its height planned before the foundation is poured, not after, because a three-quarter inch difference at the doorway is the difference between a flush threshold and a ramp.

The third question is whether the existing house can support what you are about to plug into it: the electrical service, the furnace or heat pump capacity, the water heater recovery rate, and the septic or sewer sizing. Adding 600 conditioned square feet to a house with a 100 amp service and a 20-year-old 60,000 BTU furnace usually means upgrading both.

What is included

The scope, item by item

Load path drawing

A marked-up section showing roof to footing, with header and beam sizes, post locations and footing dimensions, reviewed by a licensed structural engineer.

Foundation

Excavation, footing to below frost depth, stem wall or frost-protected shallow foundation, damp-proofing, perimeter drain to daylight or sump, and a capillary break under the slab.

Framing and tie-in

Floor, wall and roof framing, valley and step flashing at the existing roof, ice barrier, and a structural connection to the existing framing rather than a cosmetic butt joint.

Systems extension

Manual J load calculation for the added area, duct or hydronic extension, new branch circuits, service capacity check, and plumbing extension with correct venting.

Envelope and exterior

Air barrier detailing at the tie-in, cavity plus continuous insulation, siding and trim matched to the original house, and window units matched in sight line.

Interior finish

Drywall, flooring with a planned transition to the existing floor, trim, paint and any built-ins from our shop.

Numbers that govern this work

36 inMinimum footing depthBozeman frost depth; 42 in on colder benches
1,500 psfPresumptive soil bearingIRC Table 401.4.1 default for silty clay
24 inIce barrier inside warm wallMinimum at the new-to-old roof tie-in

How it runs

Six phases from first visit to punch list

  1. Zoning and feasibility

    Setbacks, lot coverage, height limits and any overlay district. We do this before design, because it changes what is possible.

  2. Structural design

    Engineer-stamped load path, foundation design based on a soil bearing assumption confirmed on site.

  3. Permit

    Building permit submittal with structural, plus mechanical, electrical and plumbing.

  4. Excavate and pour

    Footings inspected before pour, stem walls, waterproofing and backfill.

  5. Frame, dry-in, rough

    Framing inspection, roof dry-in, then mechanical, electrical and plumbing rough-in.

  6. Finish and tie-in

    Insulation, drywall, siding match, flooring transition and punch.

What moves the price

Five factors, in order of impact

Single storey versus second storey

A second storey uses an existing foundation but needs that foundation and the walls below verified. A single-storey bump-out needs new footings but touches less of the existing house.

Soil bearing

We assume 1,500 psf presumptive bearing unless a soils report says otherwise. Better soil means smaller footings; poor soil means a wider footing or piers.

Roof geometry

A gable that continues the existing ridge line is straightforward. A shed roof tucking under an existing eave usually needs a taller beam and sometimes a raised heel truss.

Service and HVAC capacity

Added conditioned area changes the heating and cooling load. A Manual J calculation decides whether the existing equipment covers it.

Site access

Excavator access, spoil storage and a place to stage material. Tight in-town lots cost more to build on than a Four Corners acre.

The band of $285 to $520 per sq ft shown on this page is a sample figure for this demo site, not a quote.

This work in practice

Projects that included this scope

Questions

What people ask about home additions

The bottom of the footing has to sit below the frost line. In Bozeman we build to 36 inches as a floor and go to 42 inches on exposed benches and in the canyon. A frost-protected shallow foundation is an alternative on some heated slab-on-grade additions, but it has to be designed, not improvised.

Not if the footing is correctly sized for the soil and the load, and not if the two structures are connected as the engineer detailed. The cracked-joint problem you have seen on other additions is almost always an undersized or shallow footing.

For anything that changes a load path, yes, and the building department will ask for the stamp. It is a small fraction of the project cost and it is the difference between a beam that is right and a beam that looks right.

No. The existing foundation, the first-floor walls and sometimes the floor system have to be able to carry the new load. We check that first. Occasionally the answer is that a single-storey addition plus a basement finish gets you the same space for less risk.

On a typical single-storey addition, six to nine weeks from the first excavator bucket to a dried-in roof, weather depending. We do not start excavation in January.

More on our questions page, grouped by scope, money, permits, living through the work and building science.

Call the shop and ask a carpenter anything

(406) 555-0182
Get a free estimate
Wide-angle shot of a modern unfurnished apartment with wooden flooring and large windows.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.