Process

Six phases, and the order is the point

Renovation is a sequencing problem wearing a carpentry costume. Ducts before drainage before wiring; structure before services; inspections before insulation.

6 phases14 to 24 weeks typicalTwo punch walks

Almost every renovation that runs long runs long for the same reason: something got built before the thing it depends on. A duct trunk gets routed through the bay where the beam has to land. Wiring goes in before the plumber has run drainage, and half of it comes back out. Insulation goes up before the framing inspection and comes back down.

The six phases below are ordinary. What makes the difference is refusing to overlap them for the sake of looking busy.

  1. Site walk

    2 to 3 hours, no charge

    We come with a moisture meter, a straightedge, a laser and a torch. We open a small inspection area where we need to, read the panel, check floor deflection and trace the load path. You get a verbal read the same day and a written summary within a week.

    • Written feasibility summary
    • Photographs of anything we opened
    • An honest budget band, not a number
  2. Scope and allowances

    2 to 4 weeks

    We write the scope line by line: what is included, what is excluded, and an allowance figure for every selection you have not made. This is the document that makes a fixed price meaningful, and it is the one worth reading twice.

    • Line-item scope of work
    • Allowance schedule
    • Draft construction schedule
  3. Design, engineering and permits

    6 to 12 weeks

    Construction drawings, structural engineering where load paths change, and permit submittal. In the conservation overlay or at Big Sky, design review runs in parallel. We also lock long-lead selections here: windows, cabinetry and tile.

    • Permit-set drawings
    • Stamped structural where required
    • Locked long-lead orders
  4. Demolition and discovery

    1 to 3 weeks

    Dust walls up, negative air running, path protected. Selective demolition exposes what the site walk could only infer. Anything we find is photographed, priced and brought to you as a change order before it is built.

    • Dust control set up
    • Discovery log with photographs
    • Any change orders priced and signed
  5. Rough-in and inspections

    4 to 10 weeks

    Framing and structure first, then mechanical, electrical and plumbing rough-in, then inspections. Nothing gets covered until it has passed. Every wall is photographed open and the photographs go in your folder.

    • Passed framing inspection
    • Passed MEP rough inspections
    • Open-wall photography
  6. Finish and punch

    4 to 10 weeks

    Insulation, drywall, flooring, trim, paint and fixtures, then two punch walks. The first one is ours and we do not invite you to it. The second is yours, and we fix what you find before final payment.

    • Two punch walks
    • Labelled panel schedule and as-built folder
    • One-year workmanship walkthrough booked

Living through it

What it is like to be in the house

Often, if the plan lets us phase the house and keep one full bathroom and a kitchen zone live throughout. It does not work when the only bathroom, the main stack or the service panel is in the scope. We tell you which case you are on the first visit.

Zippered dust walls at every work-zone boundary, negative air machines with HEPA filtration inside the zone, floor protection on the whole access path, and a daily clean at the end of each day. On pre-1978 houses we follow lead-safe practices on top of that.

Crews are on site 7 am to 5 pm Monday to Thursday and 7 am to 3 pm Friday. Noisy work such as saw cutting and demolition starts after 8 am out of respect for neighbours.

Your lead carpenter, who is on your house from demolition to punch. You get their direct number. The project manager handles contracts, change orders and the trade calendar.

Two punch walks, a labelled panel schedule, a digital folder containing photographs of every wall before it was closed, all inspection records, product and paint schedules, warranty documents, and a one-year workmanship walkthrough.

Sequence

A 16-week whole-home schedule, in the order it has to run

Ducts before drainage before wiring. Reverse any two of those and something gets cut out and rebuilt.

  1. Weeks 1 to 2

    Protection and selective demolition

    Dust walls, negative air, floor protection. Demolition room by room in the order the trades will need them. Discovery log opened.

    Carpentry, abatement where needed

  2. Weeks 3 to 5

    Structure

    Beams, posts, footings, joist sistering and any egress cutting. Everything that changes how the house carries load happens before any service is routed.

    Carpentry, concrete, engineer site visit

  3. Weeks 6 to 8

    Rough mechanical, electrical, plumbing

    Ducts first because they are the biggest and least flexible, then plumbing drainage, then supply, then electrical, which routes around everything else. This order is the single biggest cause of rework when it is done backwards.

    HVAC, plumbing, electrical

  4. Week 9

    Inspections and air sealing

    Framing and rough MEP inspections. Then air sealing at top plates, rim joists and every penetration, while the cavities are still open.

    Inspector, carpentry

  5. Weeks 10 to 11

    Insulation and drywall

    Cavity and continuous insulation, then board, tape and finish to level 4 or 5. Open-wall photography is completed before anything is covered.

    Insulation, drywall

  6. Weeks 12 to 14

    Flooring, trim and paint

    Ceilings and wall first coats, then flooring with its planned transitions, then trim and doors, then enamel and final coats.

    Flooring, finish carpentry, paint

  7. Weeks 15 to 16

    Fixtures, punch and handover

    Cabinetry, counters, plumbing and electrical trim, appliances. Internal punch walk, then your punch walk, then the as-built folder.

    All trades, final inspections

Call the shop and ask a carpenter anything

(406) 555-0182
Get a free estimate