Rooms inside a plan

Bathroom remodeling

Bathrooms come into our scope when the plumbing stack, the floor structure or the floor plan is already changing. The waterproofing and the venting are where the job is won.

5 to 9 weeks within the wider schedule$34,000 to $96,000

The two things that decide whether a bathroom lasts twenty years are the waterproofing assembly and the ventilation. A shower needs a continuous waterproof plane, correctly lapped, with the slope built into the substrate rather than into the mortar bed alone, and a pre-slope under any traditional pan. A bathroom needs an exhaust fan sized to the room and ducted to the outside in insulated rigid duct, not terminated into an attic where the moisture simply moves somewhere else.

The structural side matters too. Tile over a floor that deflects more than L/360 will crack, and natural stone needs L/720. In a 1940s house with 2x8 joists at 24 inches on centre spanning 13 feet, that check fails before you start. Sistering the joists or adding a mid-span support is part of the bathroom scope, not an extra.

We take bathrooms on as part of a wider project: a whole-home renovation, an addition, a basement finish or a main-floor re-plan. Standalone single-bathroom remodels are a specialist trade and there are good firms in Bozeman who do nothing else.

What is included

The scope, item by item

Structure check

Joist span and deflection calculation against the finish, with sistering or a mid-span beam where the floor does not meet L/360 or L/720.

Plumbing

Supply and DWV re-route with correct trap arms and venting, accessible shut-offs, and a pressure-balanced or thermostatic shower valve.

Waterproofing

A continuous waterproof plane using a sheet or liquid membrane system, pre-sloped substrate, bonded flange drain, and a flood test held for 24 hours before tile.

Ventilation

Fan sized to the room volume and fixture count, insulated rigid duct to an exterior termination, with a humidity-sensing or timer control.

Electrical

GFCI protection throughout, a dedicated circuit for the fan and heat, and code-compliant clearances around the tub and shower zones.

Finish

Tile set to the flatness the format requires, shop-built vanity where specified, glass measured after tile, and a full fixture and accessory install.

Numbers that govern this work

L/360Deflection for tileL/720 for natural stone
24 hrsFlood testBefore any tile goes over the pan
Insulated rigidFan ductTerminated outside, never in an attic

How it runs

Six phases from first visit to punch list

  1. Structure and plumbing survey

    Joist deflection, stack location, vent path and what can realistically move.

  2. Layout

    Fixture placement against clearances, door swings and the vent path.

  3. Rough-in

    Framing, blocking for grab bars and vanities, plumbing and electrical rough, then inspection.

  4. Waterproofing

    Substrate, membrane, pre-slope, drain and the 24 hour flood test.

  5. Tile and fixtures

    Tile, grout, vanity, fixtures and glass measured to the finished opening.

  6. Punch

    Function test on every fixture, fan airflow measured, and final clean.

What moves the price

Five factors, in order of impact

Whether the stack moves

Keeping the toilet within the existing stack's reach is a very different price from relocating the stack through two floors.

Floor structure

Any floor that fails the deflection check for the chosen finish needs structural work before tile.

Shower type

A prefabricated pan with a surround is the low end. A curbless, linear-drain, large-format tile shower is the high end and needs the floor framing dropped.

Tile format

Large-format tile demands a flatter substrate, more setting material and more labour than a 4 inch square.

Blocking and accessibility

Adding blocking now for future grab bars costs almost nothing. Adding grab bars later without blocking means opening a finished wall.

The band of $34,000 to $96,000 shown on this page is a sample figure for this demo site, not a quote.

This work in practice

Projects that included this scope

Questions

What people ask about bathroom remodeling

Not usually. Bathrooms come into our scope alongside a whole-home renovation, an addition, a basement finish or a floor-plan change. If a single bathroom is all you need, a dedicated bathroom firm will give you a better schedule and a better price.

Within a couple of feet of the existing stack, usually yes. Further than that and you are into re-routing drainage below the floor and re-working the vent, which on an upper floor means opening the ceiling below.

Often, by dropping or sistering the floor framing in the shower footprint to create the fall. It is a framing decision made at rough-in, not a tiling decision made later.

We plug the drain, fill the pan and hold a flood test for 24 hours, photographed at start and finish, before a single tile is set. That photograph goes in your project folder.

It is driven by room volume and fixture count, not by habit. We size it, install insulated rigid duct to an outside termination, and measure the actual airflow at punch rather than trusting the box.

More on our questions page, grouped by scope, money, permits, living through the work and building science.

Call the shop and ask a carpenter anything

(406) 555-0182
Get a free estimate
Wide-angle shot of a modern unfurnished apartment with wooden flooring and large windows.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.